Livebib
Menu

MY50

MY50 starts at 05:00 on Saturday 4 September 2027 on Jalan Kota in Taiping and finishes in the same street, with a maximum race time of 17 hours.

Jalan Kota, Taiping → Finish

Distance
54.5 km
Ascent
+1,977 m
drop bag
2
Stations
8
Time limit
≤ 17 h
Start
05:00 AMSat, Sep 4
Course & challenge

MY50

The course is 54.5 kilometres with 1,977 metres of ascent. It leaves through Taiping Lake Garden and Burmese Pool to Speedy Hill, with a view from the Sasanakkha Buddhist Sanctuary over Taiping to the Straits of Melaka, and crosses the river at Tiger Temple (AS1) on cemented platforms. From there it climbs and descends through palm estates, durian plantations and Malay reserve villages around Ayer Kuning to AS2 at the KTM tunnel, and passes through the pre-war railway tunnel on the way to Changkat Ibol (AS3).

Changkat Ibol is the main aid station, with hot meals and drinks, and the only place where spectators may help runners. AS4 overlooks the valley between Ayer Kuning and Tar Mo, and AS5 is a new station at Peak 300. The route home runs via Burmese Pool, the war cemetery, the Lake Garden, Taiping Prison and Taiping New Club. Pacers are not allowed. The organiser expects the first finisher after about four and a half hours; the last has until 22:00.

This page covers the 2027 edition. On Livebib the runner shares a link to their own broadcast, and family open it in a browser, with no account and no app, to see the position on the course line, the distance covered and a finish estimate for Jalan Kota. Under canopy the position is carried forward along the course and marked as estimated.

About Malaysia Ultra-Trail by UTMB MY50 2027

Malaysia Ultra-Trail by UTMB MY50 2027 starts on Saturday, September 4, 2027 at 05:00 AM in Jalan Kota, Taiping.

MY50: 54.5 km, 1,977 m of climbing, from Jalan Kota, Taiping to Finish, time limit 17 h.

There are 8 stations on the course.

The course

On the map

MY50 2027Open the full-resolution map

The roadbook

Stations

  1. Start

    drop bag54.4 km to Finish

    0 km20 m

    1. Tiger Temple9.631
    2. Spritzer EcoParkcrew17.418
    3. KTM Tunnel23.123
    4. Changkat Ibolcrew35.527
    5. U-turn Kuning Sari39.727
    6. Peak 30042.2180
  2. Finish

    drop bag

    54.4 km20 m

Course data verified September 24, 2026