MY25
MY25 starts at 07:00 on Saturday 4 September 2027 on Jalan Kota in Taiping and finishes in the same street, with a maximum race time of nine hours.
Jalan Kota, Taiping → Finish
- Distance
- 25.9 km
- Ascent
- +1,012 m
- drop bag
- 2
- Stations
- 4
- Time limit
- ≤ 9 h
- Start
- 07:00 AMSat, Sep 4
MY25
The course is 25.9 kilometres with 1,012 metres of ascent, and the organiser calls it fast and runnable overall. Runners go through Taiping Lake Garden into Burmese Pool, leave Speedy Hill for the Sasanakkha Buddhist Sanctuary with a first view of Taiping and the Straits of Melaka, and cross the river at Tiger Temple (AS1) on cemented platforms before climbing toward AS2 at Peak 300.
From Peak 300 the route enters the forest reserves around Burmese Pool through a water catchment area that the organiser says is open only on race weekend. The way home passes the war cemetery, the foot of Maxwell Hill, the Lake Garden, Taiping Prison and Taiping New Club. The organiser expects the first finisher after about two and a half hours; nine hours leaves time for anyone who walks the climbs. It is a good introduction to the terrain of the longer races without their night start.
This page covers the 2027 edition. On Livebib the runner shares a link to their own broadcast, and family and friends open it in a browser, with no account and no app. They see the position on the course line, the distance covered and a finish estimate that updates as the race goes, with any estimated position marked as estimated.
About Malaysia Ultra-Trail by UTMB MY25 2027
Malaysia Ultra-Trail by UTMB MY25 2027 starts on Saturday, September 4, 2027 at 07:00 AM in Jalan Kota, Taiping.
MY25: 25.9 km, 1,012 m of climbing, from Jalan Kota, Taiping to Finish, time limit 9 h.
There are 4 stations on the course.
Official website: malaysia.utmb.world
The course
On the map
Open the full-resolution mapThe roadbook
Stations
Start
drop bag26.6 km to Finish
0 km24 m
- Tiger Temple9.932
- Peak 30014165
Finish
drop bagcrew
26.6 km20 m