Livebib
Menu

MY100

MY100 starts at 03:00 on Saturday 4 September 2027 on Jalan Kota in Taiping and finishes in the same street, with a maximum race time of 32 hours.

Jalan Kota, Taiping → Finish

Distance
97.7 km
Ascent
+4,802 m
Life bases
1
drop bag
3
Stations
12
Time limit
≤ 32 h
Start
03:00 AMSat, Sep 4
Course & challenge

MY100

The course is 97.7 kilometres with 4,802 metres of ascent, through technical and non-technical trail in the Virgin Jungle Reserves around Maxwell Hill. The first climb leads from Taiping Lake Garden past Murugan Temple to AS1 at Angkasa, and is timed as a Vertical Kilometre segment: the fastest man and woman on it who also finish MY100 are honoured on stage. A long descent leads to Maxwell BaseCamp (AS2), then Tiger Temple (AS3) via Speedy Hill and Burmese Pool, Spritzer EcoPark (AS4) and the durian hills of Bukit Cempedak and Bukit Melayu to AS5.

Between AS5 and AS6 runners pass through the pre-war railway tunnel. Changkat Ibol (AS6) is the midway point, with drop bags, a hot meal and support allowed. Then comes the U-turn at Ayer Kuning (AS7), Peak 300 (AS8), and the hardest section of the day: a 7 km, 1,200 m climb to the TM Tower on Maxwell Hill and AS9 at Angkasa, followed by a 10 km, 1,000 m descent to Maxwell BaseCamp (AS10). The home trail returns via the Lake Garden, Taiping Prison and Taiping New Club. Pacers are not allowed.

This page covers the 2027 edition. Spectators are allowed at several aid stations, but most of the race happens under canopy. On Livebib, family open the runner’s own link and see the position on the course line, the distance covered and a finish estimate that updates as the race goes, with any stretch without signal carried forward and marked as estimated.

About Malaysia Ultra-Trail by UTMB MY100 2027

Malaysia Ultra-Trail by UTMB MY100 2027 starts on Saturday, September 4, 2027 at 03:00 AM in Jalan Kota, Taiping.

MY100: 97.7 km, 4,802 m of climbing, from Jalan Kota, Taiping to Finish, time limit 32 h.

There are 12 stations on the course.

The course

On the map

MY100 2027Open the full-resolution map

The roadbook

Stations

  1. Start

    drop bag62.6 km to Changkat Ibol Junction

    0 km25 m

    1. Angkasa12.51,050
    2. Maxwell Basecamp22.159
    3. Tiger Temple29.631
    4. Spritzer Ecoparkcrew37.522
    5. KTM Tunnel50.123
  2. Changkat Ibol Junction

    life basedrop bagcrew36.6 km to Finish

    62.6 km27 m

    1. U-turn Kuning Sari6727
    2. Peak 30072.1171
    3. Angkasa86.41,050
    4. Maxwell Basecamp95.968
  3. Finish

    drop bagcrew

    99.2 km20 m

Course data verified September 24, 2026