Livebib
Menu

TUNNEL 100K

Amazean Jungle Thailand by UTMB TUNNEL 100K 2027 · May 1, 2027 · Betong · 91 km · 4,400 m of climbing. Course & live tracking on Livebib.

Betong

Distance
91 km
Ascent
+4,400 m
High point
1,164 m
Start
Sat, May 1

The course

The whole race, as a ridgeline

▲ 1,164 m

Organiser: 91 km. The profile and roadbook follow the mapped line: 89.6 km.

▲ high point

About Amazean Jungle Thailand by UTMB TUNNEL 100K 2027

Amazean Jungle Thailand by UTMB TUNNEL 100K 2027 takes place on Saturday, May 1, 2027 in Betong.

TUNNEL 100K: 91 km, 4,400 m of climbing.

The climbs

The climbs that decide the day

  1. 3D
    01

    km 15.7

    5.9 km+410 m7 %

    crest at km 15.7

  2. 3D
    02

    km 28.7

    5.8 km+290 m5 %

    crest at km 28.7

  3. 3D
    03

    Climb before Gunung Kubang Badak

    2.2 km+481 m21.4 %

    crest at km 32.6

  4. 3D
    04

    Climb after Gunung Kubang Badak

    5.6 km+568 m10.1 %

    crest at km 41.5

  5. 3D
    05

    km 52.1

    1.2 km+305 m25.9 %

    crest at km 52.1

The course

On the map

TUNNEL 100K 2027Open the full-resolution map

Course data verified November 13, 2026